2017 USBC Senior Masters FINAL

Lanes will be double stripped each morning and lanes will be conditioned one (1) time per day in the morning.

Source: kegel · Conditioner: ICE

Distance
43 ft
Length
Long
Ratio
2.2:1
Total oil
28.52 mL
Forward
21.31 mL
Reverse
7.21 mL

Lane diagram

light medium heavy · forward reverse

3D surface

Machine load specs

Forward

BoardsLoadsMicsSpeedFeetCrossedOil µL
2L–2R445180.0–7.61486660
4L–5R440187.6–17.81285120
5L–6R2551017.8–20.6603300
8L–8R2551820.6–25.7502750
6L–6R3402225.7–35.0873480
2L–2R0402235.0–39.000
2L–2R0401039.0–43.000

Reverse

BoardsLoadsMicsSpeedFeetCrossedOil µL
2L–2R0503039.0–36.000
13L–15R3503036.0–23.3391950
11L–7R2503023.3–14.8462300
2L–2R2403014.8–6.3742960
2L–2R050106.3–0.000