2006 WTBA World Youth Championships Short
Designed for the Kegel TRANSFER BRUSH SYSTEM on FUNK Lane Surface using OFFENSE HV and FIZZION. The Bowling Center did not have climate control and temperatures reached over 90 F.
Source: kegel
- Distance
- 32 ft
- Length
- Short
- Ratio
- 2.0:1
- Total oil
- —
Lane diagram
3D surface
Machine load specs
This archive file does not include oil-dose (MICS) values, so absolute volumes are unavailable. The diagrams above show the pattern's relative shape from the load passes.
Forward
| Boards | Loads | Mics | Speed | Feet | Crossed | Oil µL |
|---|---|---|---|---|---|---|
| 2L–2R | 1 | — | 14 | 0.0–0.0 | 37 | — |
| 5L–5R | 2 | — | 14 | 0.0–3.9 | 62 | — |
| 6L–6R | 2 | — | 14 | 3.9–7.8 | 58 | — |
| 7L–7R | 2 | — | 18 | 7.8–12.9 | 54 | — |
| 2L–2R | 0 | — | 18 | 12.9–24.0 | 0 | — |
| 3L–3R | 0 | — | 26 | 24.0–32.0 | 0 | — |
Reverse
| Boards | Loads | Mics | Speed | Feet | Crossed | Oil µL |
|---|---|---|---|---|---|---|
| 2L–2R | 0 | — | 30 | 32.0–27.0 | 0 | — |
| 8L–8R | 1 | — | 18 | 27.0–24.5 | 25 | — |
| 7L–7R | 2 | — | 18 | 24.5–19.4 | 54 | — |
| 6L–6R | 2 | — | 14 | 19.4–15.5 | 58 | — |
| 5L–5R | 2 | — | 14 | 15.5–11.6 | 62 | — |
| 2L–2R | 2 | — | 10 | 11.6–8.8 | 74 | — |
| 2L–2R | 0 | — | 10 | 8.8–0.0 | 0 | — |